NameEntry/ ExitValid 
from
Valid 
to
Maximum 
technical
capacity[kWh/h]
Contractual
agreed fixed 
capacity
[kWh/h]
Free capacity*
[kWh/h]
Efficiency
%
Traffic
light
Flow rate
Dornum Enrty 01.10.
2009

01.10.
2010

01.02.
2012
30.09.
2010

31.01.
2012

30.09.
2015
5.387.359


5.387.359


12.766.530
5.387.359


5.490.859


5.663.359
0


1.744.171


7.103.171
100








Flow rate
  
Etzel/OGE Entry 01.07.
2009
30.09.
2013
0 0 0 100
Etzel/OGE      Exit 01.10.
2011
30.09.
2015
0 0 0 100
Etzel/EGL Entry 01.10.
2011
30.09.
2015
0 0 0 100
Etzel/EGL Exit 01.10.
2011
30.09.
2015
0 0 0 100
Etzel/EKB Entry 01.10.
2011
30.09.
2015
0 0 0 100
Etzel/EKB Exit 01.10.
2011
30.09.
2015
0 0 0 100